20.May.2011

The works in the big pool have finished with the construction of a thin wall inside, protecting the stairs originally built. The baths have been adapted, and the fence is now surrounding the pool area. We are considering to plant a hedge around it to hide it.

The works in the south pool have already started, this will take longer as it will include the construction of toilets attached to block 4.